5000 kVA Substation Transformer

Price range: $86,150.00 through $285,000.00

Substation Transformer, 115kV, 15kV, 25kV, 35kV, 46kV, 69kV primary, 12470V, 24940V, 34500V, 4160V secondary. Aluminum windings, mineral oil, ONAN cooled, built to ANSI/IEEE C57.12 and DOE 2016 efficiency. 47 voltage configurations available.

Lead time: As little as 10 weeks. Copper windings and STRATA X3 natural ester available on request.

Contact Us
SKU: BPS-SUB-5000K Category:

The 5000 kVA substation transformer is built for primary distribution service, stepping medium- or high-voltage supply down to a distribution or utilization voltage. It is supplied with throat or bus connections for integration into a switchgear lineup. At 5000 kVA it operates as a distribution substation transformer with full radiator banks and high-voltage bushings.

Specifications

Rating 5000 kVA
Phase Three phase
Primary voltage class 115kV / 15kV / 25kV / 35kV / 46kV / 69kV
Secondary voltage class 12470V / 24940V / 34500V / 4160V
Basic insulation level (BIL) 550 kV / 95 kV / 125 kV / 150 kV / 250 kV / 350 kV
Frequency 60 Hz
Temperature rise 65 °C
Winding material Aluminum
Insulating fluid Mineral oil, Type I
Cooling class ONAN
Taps Plus/minus 2 x 2.5% full-capacity below and above nominal
Enclosure Munsell Green 7GY3.29/1.5, tamper-resistant
Feed configuration Per application
Standards ANSI/IEEE C57.12, NEMA, DOE 2016 efficiency
Lead time As little as 10 weeks

Available voltage configurations

The 5000 kVA is offered in 47 primary and secondary voltage combinations. Price is set by voltage class, so every voltage within a class carries the same price – a 12470Y/7200 primary and a 13200Y/7620 primary are both 15 kV class and cost the same.

Primary voltages available:

  • 115kV class — 115000 GrdY
  • 15kV class — 2400 Delta, 4160 Delta, 4160Y/2400, 4800 Delta, 7200 Delta, 12000 Delta, 12470Y/7200, 13200 Delta, 13200Y/7620, 13800 Delta, 13800Y/7970
  • 25kV class — 22900Y/13200, 24940Y/14400
  • 35kV class — 34500 Delta, 34500Y/19920
  • 46kV class — 46000 Delta
  • 69kV class — 69000 Delta

Secondary voltages available:

  • 12470V class — 12470Y/7200, 13200Y/7620, 13800 Delta
  • 24940V class — 24940Y/14400
  • 34500V class — 34500Y/19920
  • 4160V class — 4160Y/2400

Full-load current

Rated secondary current for a 5000 kVA unit at each available secondary voltage. Use these figures for conductor, breaker and bus sizing.

Secondary voltage Full-load current
12470Y/7200 231 A
13200Y/7620 219 A
13800 Delta 209 A
24940Y/14400 116 A
34500Y/19920 84 A
4160Y/2400 694 A

Rated primary current at each available primary voltage:

Primary voltage Full-load current
115000 GrdY 25 A
2400 Delta 1,203 A
4160 Delta 694 A
4160Y/2400 694 A
4800 Delta 601 A
7200 Delta 401 A
12000 Delta 241 A
12470Y/7200 231 A
13200 Delta 219 A
13200Y/7620 219 A
13800 Delta 209 A
13800Y/7970 209 A
22900Y/13200 126 A
24940Y/14400 116 A
34500 Delta 84 A
34500Y/19920 84 A
46000 Delta 63 A
69000 Delta 42 A

Typical applications

  • Heavy industrial primary supply
  • Large renewable generation collection
  • Data center campus primary supply
  • Utility distribution substations

Construction

Standard construction is aluminum windings in a sealed tank with mineral oil, ONAN cooled, 65 °C rise. The tank is welded and finished in Munsell Green 7GY3.29/1.5. A four-position no-load tap changer provides plus and minus two 2.5% full-capacity taps. Copper windings and natural ester fluid, including STRATA X3, are available on request.

Standards and compliance

  • Built to ANSI/IEEE C57.12 and applicable NEMA standards
  • Meets DOE 2016 efficiency requirements
  • Factory test report supplied with every unit
  • Manufactured and supported by Bear Power Solutions, Brandon, Mississippi

Frequently asked questions

What voltages is the 5000 kVA available in?

The 5000 kVA is available with 115kV / 15kV / 25kV / 35kV / 46kV / 69kV primary and 12470V / 24940V / 34500V / 4160V secondary. That is 47 configurations in total. Every voltage inside a class carries the same price and the same basic insulation level.

What is the lead time on a 5000 kVA?

Lead times start at 10 weeks from order confirmation, depending on configuration and current factory loading. Non-standard voltages, accessories, custom enclosure work and non-standard fluid or winding material extend that. Confirm the delivery date with Bear Power Solutions before committing to a project schedule.

Can this be supplied with a switchgear throat connection?

Yes. Substation transformers are commonly supplied with primary and secondary throat or bus connections for direct integration into a switchgear lineup. Specify the mating arrangement at time of quotation.

Can the 5000 kVA be supplied with copper windings or natural ester fluid?

Standard catalog construction is aluminum windings with mineral oil. Copper windings and natural ester fluid – including STRATA X3, Bear Power Solutions’ own Type II natural ester – are available on request. Both affect price and lead time, so request a quotation for a non-standard build.

What standards does the 5000 kVA meet?

Units are built to ANSI/IEEE C57.12 and applicable NEMA standards, and meet DOE 2016 efficiency requirements. Factory test reports are provided with every unit.

Sizing the 5000 kVA

At its lowest available secondary voltage the 5000 kVA draws 694 A at full load; at its highest it draws 84 A. That spread is what makes secondary voltage selection an installation-cost decision as much as an electrical one – the higher voltage cuts conductor size for the same delivered power.

Secondary current at this rating is high enough that parallel conductor runs or busway are normally required on the low-voltage side. Confirm the secondary termination arrangement and available bus space before ordering.

Choosing between 5000 kVA and adjacent ratings

Bear Power Solutions also builds the 3750 kVA below it and the 7500 kVA above it in this family. If your calculated connected load sits within about 20 percent of the 5000 kVA rating, the 7500 kVA is usually the better specification – transformers run most efficiently loaded well below nameplate, and the headroom costs less now than a replacement does later. If your load is comfortably under the 5000 kVA figure, the 3750 kVA carries lower no-load losses and a lower purchase price. Request a quote below with your actual load data and Bear Power Solutions will recommend a rating.

Request a quote

For a firm price on a 5000 kVA in a specific voltage configuration, or for a non-standard build with copper windings, natural ester fluid or custom accessories, send the details below and Bear Power Solutions will respond with a written quotation.

Weeks: 0
How quick do you need this Transformer(s)?
Weight 24900 lbs
Primary Voltage

115000 GrdY, 12000 Delta, 12470Y/7200, 13200 Delta, 13200Y/7620, 13800 Delta, 13800Y/7970, 22900Y/13200, 2400 Delta, 24940Y/14400, 34500 Delta, 34500Y/19920, 4160 Delta, 4160Y/2400, 46000 Delta, 4800 Delta, 69000 Delta, 7200 Delta

Secondary Voltage

12470Y/7200, 13200Y/7620, 13800 Delta, 24940Y/14400, 34500Y/19920, 4160Y/2400

Shopping Cart