// Three-Phase Pad-Mount · 75–10,000 kVA

Three-Phase
Pad-Mounts.

Three-phase pad-mount transformers for commercial buildings, plants, data center support loads and utility service. The catalog lists 75 to 5,000 kVA; units up to 10,000 kVA are quoted to spec. Dead-front, radial-feed construction with mineral oil and ONAN cooling, built to ANSI/IEEE C57.12 and DOE 2016 efficiency. Primaries from 2.4 to 34.5 kV; secondaries 208Y/120 to 600Y/347. Typical lead time is 12–16 weeks, and we keep hundreds of units in stock. UL Listed and B.A.B.A. options are available.

kVA range75–10,000 kVA
Primary15–35 kV class
Secondary208Y/120–600Y/347
ConstructionDead front · Radial feed
Lead time12–16 wks
Ordering online? Stock moves fast, so call 601-912-3512 or email sales@bearpowersolutions.com to confirm inventory before you check out. If a unit has sold, we can build it on our normal 12–16 week lead time.

Three Phase Pad-Mounted Distribution Transformers

Showing all 14 results

// Custom builds

Don’t see
your spec?

Send the kVA, primary and secondary voltage, and quantity. Copper windings and natural ester fluid are available on request. Typical lead time is 12–16 weeks.

// Trusted by
  • Supermicro logo
  • Flex logo
  • Memphis Light, Gas and Water (MLGW) logo
  • City of Fort Collins logo
  • City Utilities logo
  • Athens Utilities Board logo
  • TCEC logo
  • ALLETE Clean Energy logo
  • Entegrity logo
  • ASRC Federal logo
  • Lockheed Martin logo
  • DAVIS-MONTHANAir Force Base
  • FAIRCHILDAir Force Base
  • Oklahoma City University logo
  • Chicago Housing Authority logo
Shopping Cart