75 kVA Single-Phase Pole-Mount Transformer

Price range: $4,550.00 through $6,500.00

Single-Phase Pole-Mount Transformer, 15kV, 25kV, 35kV primary, 240V, 600V secondary. Aluminum windings, mineral oil, ONAN cooled, built to ANSI/IEEE C57.12 and DOE 2016 efficiency. 56 voltage configurations available.

Lead time: As little as 10 weeks. Copper windings and natural ester fluid available on request.

Contact Us
SKU: BPS-1PH-PM-75K Category:

The 75 kVA single-phase pole-mount distribution transformer is an overhead unit built for utility and rural distribution service. It hangs from a single pole or crossarm bracket and steps medium-voltage primary down to a 277 or 480 V secondary. At 75 kVA it covers the residential and light-commercial end of the range, where one unit typically serves a small cluster of services or a single farm or irrigation load.

Specifications

Rating 75 kVA
Phase Single phase
Primary voltage class 15kV / 25kV / 35kV
Secondary voltage class 240V / 600V
Basic insulation level (BIL) 95 kV / 125 kV / 150 kV
Frequency 60 Hz
Temperature rise 65 °C
Winding material Aluminum
Insulating fluid Mineral oil, Type I
Cooling class ONAN
Taps Plus/minus 2 x 2.5% full-capacity below and above nominal
Enclosure Munsell Green 7GY3.29/1.5, tamper-resistant
Feed configuration Per application
Standards ANSI/IEEE C57.12, NEMA, DOE 2016 efficiency
Lead time As little as 10 weeks

Full-load current

Rated secondary current for a 75 kVA unit at each available secondary voltage. Use these figures for conductor, breaker and bus sizing.

Secondary voltage Full-load current
120/240 312 A
240/480 156 A
277 271 A
480 156 A

Rated primary current at each available primary voltage:

Primary voltage Full-load current
2400 31 A
4160GrdY/2400 31 A
4800 16 A
7200 10 A
7620 9.8 A
12000 6.2 A
12470GrdY/7200 10 A
13200GrdY/7620 9.8 A
13800GrdY/7970 9.4 A
14400 5.2 A
19920 3.8 A
22900GrdY/13200 5.7 A
24940GrdY/14400 5.2 A
34500GrdY/19920 3.8 A

Typical applications

  • Single-family and small multi-family services
  • Temporary and construction power
  • Overhead utility distribution
  • Rural and agricultural service
  • Irrigation and well pumps

Construction

Standard construction is aluminum windings in a sealed tank with mineral oil, ONAN cooled, 65 °C rise. The tank is welded and finished in Munsell Green 7GY3.29/1.5. A four-position no-load tap changer provides plus and minus two 2.5% full-capacity taps. Copper windings and natural ester fluid are available on request.

Standards and compliance

  • Built to ANSI/IEEE C57.12 and applicable NEMA standards
  • Meets DOE 2016 efficiency requirements
  • Factory test report supplied with every unit
  • Manufactured and supported by Bear Power Solutions, Brandon, Mississippi

Frequently asked questions

What voltages is the 75 kVA available in?

The 75 kVA is available with 15kV / 25kV / 35kV primary and 240V / 600V secondary. That is 56 configurations in total. Every voltage inside a class carries the same price and the same basic insulation level.

What is the lead time on a 75 kVA?

Lead times start at 10 weeks from order confirmation, depending on configuration and current factory loading. Non-standard voltages, accessories, custom enclosure work and non-standard fluid or winding material extend that. Confirm the delivery date with Bear Power Solutions before committing to a project schedule.

Can this transformer be pad-mounted instead of pole-mounted?

Bear Power Solutions supplies equivalent ratings in pad-mount configuration. Pole-mount units above 167 kVA are heavy enough that pole and crossarm capacity should be verified, and larger ratings are commonly supplied pad-mounted or platform-mounted instead.

Can the 75 kVA be supplied with copper windings or natural ester fluid?

Standard catalog construction is aluminum windings with mineral oil. Copper windings and natural ester fluid are available on request. Both affect price and lead time, so request a quotation for a non-standard build.

What standards does the 75 kVA meet?

Units are built to ANSI/IEEE C57.12 and applicable NEMA standards, and meet DOE 2016 efficiency requirements. Factory test reports are provided with every unit.

Sizing the 75 kVA

At its lowest available secondary voltage the 75 kVA draws 312 A at full load; at its highest it draws 156 A. That spread is what makes secondary voltage selection an installation-cost decision as much as an electrical one – the higher voltage cuts conductor size for the same delivered power.

Secondary current at this rating is generally within the range of single conductor runs per phase, which keeps termination and cable costs down.

Request a quote

For a firm price on a 75 kVA in a specific voltage configuration, or for a non-standard build with copper windings, natural ester fluid or custom accessories, send the details below and Bear Power Solutions will respond with a written quotation.

Weeks: 0
How quick do you need this Transformer(s)?
Primary Voltage

12000, 12470GrdY/7200, 13200GrdY/7620, 13800GrdY/7970, 14400, 19920, 22900GrdY/13200, 2400, 24940GrdY/14400, 34500GrdY/19920, 4160GrdY/2400, 4800, 7200, 7620

Secondary Voltage

120/240, 240/480, 277, 480

Shopping Cart

PLEASE CALL 601-912-3512 OR EMAIL SALES@BEARPOWERSOLUTIONS.COM TO VERIFY STOCK BEFORE SUBMITTING AN ORDER ON OIL FILLED TRANSFORMERS